Client: Harry Hamilton | Location: Nun Raw Farm | Duration: 2 months
Agricultural developments - Demolition of existing farm buildings and earthworks in preparation for future farm development.


Client: Advance | Location: Newton Farm Phase 4 | Duration: 5 months
Housing development – Moving previously surcharged material which had been used to compress the ground below for a specified period....


Client: Tarmac | Location: Douglas Muir | Duration: 3 months
Quarry Development – Stripping soils and overburden to expose the product hard rock in preparation for blasting. Soils from advance strip...


Client: Advance | Location: Newton Farm Phase 3 | Duration: 2 months
Housing development – Moving previously surcharged material which had been used to compress the ground below for a specified period. Once...


Client: Kier | Location: Greenburn | Duration: 7 months
Restore former opencast surface mine, by removing previously bunded overburden and soils and placing in accordance with approved...


Client: Synergy | Location: Calderwood | Duration: 2 months
Housing development - Strip soils and create screening bund around sensitive parts of the site. Carry out Cut to Fill operations and...


Client: Tarmac | Location: Newbigging | Duration: 2 months
Quarry Development – Strip soils and overburden to expose the product Sand and Gravel. All materials hauled into designated stockpile...


Client: Cemex | Location: Newbridge | Duration: 4 months
Quarry Development / Operations - Strip soils and overburden to expose the product rock. All materials hauled into designated areas for...


Client: Advance | Location: Goerbridge | Duration: 4 months
Housing development – Strip soils from site and stored on site in landscaped bunds. Carry out cut to fill and compaction. GPS on machines...


Client: Advance | Location: Haddington | Duration: 10 months
Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to...


Client: Synergy | Location: Mavor Ave | Duration: 2 months
Housing development – Rip up concrete floor from previous factory, recycle steel, hammer oversize concrete slabs prior to crushing. Crush...


Client: Advance | Location: Monifieth | Duration: 4 months
Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to...


Client: Advance | Location: Halo Project Kilmarnock | Duration: 5 months
Housing development – Rip up concrete slabs from former whisky factory, separate steel rebar from concrete, recycle steel and process...


Client: Menzies Contracts | Location: Moorfield Kilmarnock | Duration: 4 Months
Industrial development – In preparation of industrial units being constructed, strip soils and place in onsite designated tips. Carry out...


Client: Transport Scotland | Location: A9 Aviemore | Duration: 2 years
Road Upgrade and construction – All works carried out in line with strict environmental control measures associated with operating within...


Client: Raynesway | Location: Glasgow | Duration: 2 Months
Sir Chris Hoy Velodrome, National Indoor Sports Arena.


Client: Cemex | Location: Near Peebles | Duration: 6 Weeks
Cowieslinn Quarry, Overburden Stripping &Tip Construction.


Client: Cemex | Location: Newbridge | Duration: 6 Weeks
Bonnington Mains Quarry, Overburden Stripping &Tip Construction.


Client: Hunts Contractors | Location: Livingston | Duration: 4 Weeks
Glenturner Distillery, Soil stripping and reduction to formation level & Tip construction.


Client: Black & Veatch | Location: Glencorse, Penicuik | Duration: 2.5 Years
Excavation and formation works to enable water treatment buildings to be constructed below original ground level. Muck hauled to on site...