Excavation and formation works to enable water treatment buildings to be constructed below original ground level.
Muck hauled to on site tips as well as hauling to our off site SEPA licensed tip. Supply and laying of Geotextiles and
gravel to provide horizontal and vertical drainage around the structures. Compaction of suitable clays around the
structures as well as placing topsoil on the roof of the structures with low ground pressure machines.
Comments