Client: Kier | Location: Greenburn | Duration : 3 Years
Continuation of restoration of the former opencast surface mine, by removing previously bunded overburden and soils and placing in...
Client: Cemex | Location: Middleton | Duration: 6 Months
Quarry Operations – loading quarried material into crushing /screening equipment to produce Gabion stone and single sized products such...
Client: Synergy | Location: Millerhill Phase 2 | Duration: 6 Months
Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to...
Client: Advance | Location: Newlands | Duration: 10 Months
Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to...
Client: Advance | Location: Philipshill | Duration: 1.5 Years
Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to...
Client: Synergy | Location: Callander | Duration: 1 month
Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to...
Client: Great British Prawns | Location: Balfron | Duration: 2 weeks
Factory development – Installation of new and upgrading of existing drainage, supply of imported quarried stone for drainage and...
Client: Tarmac | Location: Hillwood | Duration: 3 months
Quarry Operations – Recycling by munching concrete off ex demolition material, remove steel into recycled skips. Crush ex demolition...
Client: Tarmac | Location: Reilly | Duration: 2 months
Quarry Operations – loading blasted rock from the quarry face into crushing equipment to produce Type 1 and crusher run to highways...
Client: Synergy | Location: Millerhill | Duration: 1 week
Housing development – Site Clearance. Removal of trees, hedgerows and mulching felled wood and site vegetation, prior to earthworks...
Client: Cemex | Location: Bonnington | Duration: 3 months
Quarry Operations - loading quarried material into crushing equipment to produce Highway specification Type 1 and Crusher run.
Client: Cemex | Location: Moota | Duration: 2 months
Quarry Operations – Stripping soils and place in screening bunds, remove superficial materials to tip and removing interburden shale to...
Client: Cemex | Location: Hyndford | Duration: 2 months
Quarry Development – Stripping soils and place in screening bunds to allow product sand and gravel to be quarried.
Client: Tarmac | Location: Snabe | Duration: 2 months
Quarry Operations – loading quarried material into crushing /screening equipment to produce single sized stone products 10mm and 20mm to...
Client: Bell Ingram | Location: Calla Road | Duration: 2 weeks
Forestry Development – Stripping soils, carrying out cut to fill to form track profile and supply, spread and compact imported quarry...
Client: Tarmac | Location: Reilly Crush | Duration: 2 months
Quarry Operations – loading blasted rock from the quarry face into crushing equipment to produce Type 1 and crusher run to highways...
Client: Cemex | Location: Temple | Duration: 1 month
Quarry Development – Stripping soils and place in screening bunds to allow product sand and gravel to be quarried.
Client: Ruchlaw Produce | Location: Rigside | Duration: 3 months
Agricultural Development – Creation of formation area to allow road network, buildings, and slurry store to be constructed. Strip soils...
Client: Tarmac | Location: Cairneyhill | Duration: 3 months
Quarry Development – Stripping soils, peat, and overburden to expose the product hard rock, cleaning rockhead in preparation for...
Client: McGregor | Location: East Law Farm | Duration: 1 month
Agricultural development – Creation of an approved slurry lagoon. Strip soils from footprint of area, excavate into slope and use...