OUR PROJECTS

Click Photo for more information.

KierGreen burn.JPG
Kier - Greenburn Project

Client:

Kier

Location:

Greenburn

Duration:

ongoing

Job Description:

Continuation of restoration of the former opencast surface mine, by removing previously bunded overburden and soils and placing in accordance with approved restoration plan. Naturalizing redundant water settlement lagoons and other environmental improvements to return the site to wildlife and agricultural use.

cemex.JPG
Cemex - Middleton

Client:

Cemex

Location:

Middleton

Duration:

ongoing

Job Description:

Quarry Operations – loading quarried material into crushing /screening equipment to produce Gabion stone and single sized products such as 10mm, 6mm, 4mm to surface dressing highways specification.

project-3.jpg
Synergy - Millerhill Phase 2

Client:

Synergy

Location:

Millerhill Phase 2

Duration:

ongoing

Job Description:

Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to specification for future, SUDS ponds, house building and road construction. All done with GPS enabled equipment to mm accuracy.

advance.JPG
Advance - Newlands

Client:

Advance

Location:

Newlands

Duration:

ongoing

Job Description:

Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to specification for future, SUDS ponds, house building and road construction.

advancephilips.JPG
Advance - Philipshill

Client:

Advance

Location:

Philipshill

Duration:

ongoing

Job Description:

Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to specification for future, SUDS ponds, house building and road construction.

synergyCallander.JPG
Synergy - Callander

Client:

Synergy

Location:

Callander

Duration:

1 month

Job Description:

Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to specification for future, SUDS ponds, house building and road construction.

project-3.jpg
Great British Prawns - Balfron

Client:

Great British Prawns

Location:

Balfron

Duration:

2 weeks

Job Description:

Factory development – Installation of new and upgrading of existing drainage, supply of imported quarried stone for drainage and landscaping. Cut and fill landscaping works and Resoil designated areas.

Tarmachillwood.JPG
Tarmac- Hillwood

Client:

Tarmac

Location:

Hillwood

Duration:

3 months

Job Description:

Quarry Operations – Recycling by munching concrete off ex demolition material, remove steel into recycled skips. Crush ex demolition concrete to produce 6F5 to highways specification for future reuseon of suitable clays around the 

structures as well as placing topsoil on the roof of the structures with low ground pressure machines.

TarmacReilly.JPG
Tarmac- Reilly

Client:

Tarmac

Location:

Reilly

Duration:

2 months

Job Description:

Quarry Operations – loading blasted rock from the quarry face into crushing equipment to produce Type 1 and crusher run to highways specification.

project-3.jpg
Synergy - Millerhill

Client:

Synergy

Location:

Millerhill

Duration:

1 week

Job Description:

Housing development – Site Clearance. Removal of trees, hedgerows and mulching felled wood and site vegetation, prior to earthworks commencing.

project-3.jpg
Cemex - Bonnington

Client:

Cemex

Location:

Bonnington

Duration:

3 months

Job Description:

Quarry Operations - loading quarried material into crushing equipment to produce Highway specification Type 1 and Crusher run.

cemexMoota.JPG
Cemex - Moota

Client:

Cemex

Location:

Moota

Duration:

2 months

Job Description:

Quarry Operations – Stripping soils and place in screening bunds, remove superficial materials to tip and removing interburden shale to onsite backfill tip, exposing product rock for blasting.

CenexHyndford.JPG
Cemex - Hyndford

Client:

Cemex

Location:

Hyndford

Duration:

2 months

Job Description:

Quarry Development – Stripping soils and place in screening bunds to allow product sand and gravel to be quarried.

project-3.jpg
Tarmac - Snabe

Client:

Tarmac

Location:

Snabe

Duration:

2 months

Job Description:

Quarry Operations – loading quarried material into crushing /screening equipment to produce single sized stone products 10mm and 20mm to highways specification.

Bellingham.JPG
Bell Ingram - Calla Road

Client:

Bell Ingram

Location:

Calla Road

Duration:

2 weeks

Job Description:

Forestry Development – Stripping soils, carrying out cut to fill to form track profile and supply, spread and compact imported quarry stone, all to allow HGV’s access to site to haul away logs that have been previously felled.

TarmacReily.JPG
Tarmac - Reilly Crush

Client:

Tarmac

Location:

Reilly Crush

Duration:

2 months

Job Description:

Quarry Operations – loading blasted rock from the quarry face into crushing equipment to produce Type 1 and crusher run to highways specification.

cemextemple.JPG
Cemex - Temple

Client:

Cemex

Location:

Temple

Duration:

1 month

Job Description:

Quarry Development – Stripping soils and place in screening bunds to allow product sand and gravel to be quarried.

ruchlaw.JPG
Ruchlaw Produce - Rigside

Client:

Ruchlaw Produce

Location:

Rigside

Duration:

3 months

Job Description:

Agricultural Development – Creation of formation area to allow road network, buildings, and slurry store to be constructed. Strip soils and landscape on site. Carry out cut and fill and landscape surplus material on site. Profile the area with GPS equipment prior to supplying and spreading stone to allow builders to start construction.

tarmaccairney.JPG
Tarmac - Cairneyhill

Client:

Tarmac

Location:

Cairneyhill

Duration:

3 months

Job Description:

Quarry Development – Stripping soils, peat, and overburden to expose the product hard rock, cleaning rockhead in preparation for blasting. Soils and peat used to restore completed parts of the quarry. Desilting of fines from processing plant and incorporating into progressive restoration on site.

McgregorEast.JPG
McGregor - East Law Farm

Client:

McGregor

Location:

East Law Farm

Duration:

1 month

Job Description:

Agricultural development – Creation of an approved slurry lagoon. Strip soils from footprint of area, excavate into slope and use excavation to fill lower section of site, profile lagoon accurately to specifications, install pipework for future slurry pumping and land drainage altered due to footprint of new lagoon. Resoil disturbed ground

project-3.jpg
Harry Hamilton - Nun Raw Farm

Client:

Harry Hamilton

Location:

Nun Raw Farm

Duration:

2 months

Job Description:

Agricultural developments - Demolition of existing farm buildings and earthworks in preparation for future farm development.

advancenewton.JPG
Advance - Newton Farm Phase 4

Client:

Advance

Location:

Newton Farm Phase 4

Duration:

5 months

Job Description:

Housing development – Moving previously surcharged material which had been used to compress the ground below for a specified period. Allowing preparation for building works to commence after a suitable monitoring period. Cut, fill and compaction in virgin ground in preparation of house building.

TDouglas.JPG
Tarmac - Douglas Muir

Client:

Tarmac

Location:

Douglas Muir

Duration:

3 months

Job Description:

Quarry Development – Stripping soils and overburden to expose the product hard rock in preparation for blasting. Soils from advance strip used to restore completed part of the quarry and the overburden used to enhance the quarry restoration profile whilst dealing with complex geotechnical features.

AdvanceNewtonFarmPhase3.JPG
Advance- Newton Farm Phase 3

Client:

Advance

Location:

Newton Farm Phase 3

Duration:

2 months

Job Description:

Housing development – Moving previously surcharged material which had been used to compress the ground below for a specified period. Once the 100,000 tonnes of material removed, this allowed the preparation for building works to commence after a suitable monitoring period.

KierGreenburn2.JPG
Kier - Greenburn

Client:

Kier

Location:

Greenburn

Duration:

7 months

Job Description:

Restore former opencast surface mine, by removing previously bunded overburden and soils and placing in accordance with approved restoration plan.

SynergyCalderwood.JPG
Synergy - Calderwood

Client:

Synergy

Location:

Calderwood

Duration:

2 months

Job Description:

Housing development - Strip soils and create screening bund around sensitive parts of the site. Carry out Cut to Fill operations and compact to specification for future building and road construction.

project-3.jpg
Tarmac- Newbigging

Client:

Tarmac

Location:

Newbigging

Duration:

2 months

Job Description:

Quarry Development – Strip soils and overburden to expose the product Sand and Gravel. All materials hauled into designated stockpile which was landscaped for use as visual and noise reduction screening bund.

AdvanceGoerbridge.JPG
Advance- Goerbridge

Client:

Advance

Location:

Goerbridge

Duration:

4 months

Job Description:

Housing development – Strip soils from site and stored on site in landscaped bunds. Carry out cut to fill and compaction. GPS on machines for accurate efficient profiling of formation level.

project-3.jpg
Cemex - Newbridge

Client:

Cemex

Location:

Newbridge

Duration:

4 months

Job Description:

Quarry Development / Operations - Strip soils and overburden to expose the product rock. All materials hauled into designated areas for quarry restoration. Product rock already on site pushed to new area for processing on site.

AdvanceHaddington.JPG
Advance - Haddington

Client:

Advance

Location:

Haddington

Duration:

10 months

Job Description:

Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to specification for future, SUDS ponds, house building and road construction.

SynergyMayorAve.JPG
Advance - Mavor Ave

Client:

Synergy

Location:

Mavor Ave

Duration:

2 months

Job Description:

Housing development – Rip up concrete floor from previous factory, recycle steel, hammer oversize concrete slabs prior to crushing. Crush demolition concrete and spread on site for access to piling rig. Carry out Cut to Fill operations and compact to specification for future, house building and road construction

project-3.jpg
Advance - Monifieth

Client:

Advance

Location:

Monifieth

Duration:

4 months

Job Description:

Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to specification for future, SUDS ponds, house building and road construction. Excavate rock from onsite borrow pit and process via crushing and screening equipment to produce 6F2 and 10-20mm drainage products all for use on site to minimise imported quarried materials.

project-3.jpg
Advance - Halo Project Kilmarnock

Client:

Advance

Location:

Halo Project Kilmarnock

Duration:

5 months

Job Description:

Housing development – Rip up concrete slabs from former whisky factory, separate steel rebar from concrete, recycle steel and process concrete for re use on site. Earthworks involved cut / fill and compaction allowing future construction works to take place.

project-3.jpg
Menzies Contracts - Moorfield Kilmarnock

Client:

Menzies Contracts

Location:

Moorfield Kilmarnock

Duration:

4 Months

Job Description:

Industrial development – In preparation of industrial units being constructed, strip soils and place in onsite designated tips. Carry out cut, fill and compaction to formation levels set on site with surplus materials being landscaped on site. Spread and compaction of imported quarry stone.

TransportScotlandA9.JPG
Transport Scotland  - A9 Aviemore

Client:

Transport Scotland

Location:

A9 Aviemore

Duration:

2 years

Job Description:

Road Upgrade and construction – All works carried out in line with strict environmental control measures associated with operating within a national park. MWP involved in relocating wildlife habitat, such as ants’ nests. MWP carried out all site clearance, demolition of existing structures on old A9, Earthworks including borrow pits to support site and hauling in materials from local quarries, all Drainage, Communication Ducting, Landscaping including placement of stone on verges and central reservations throughout the entire 8km dual carriageway, 10km of side roads and 8km of cycle / footpaths all to highway specification. MWP carried out all works on site up to underside of blacktop except for concrete structures.

Case study NISA.JPG
Raynesway- Glasgow

Client:

Raynesway

Location:

Glasgow

Duration:

2 Months

Job Description:

Sir Chris Hoy Velodrome, National Indoor Sports Arena.

project-3.jpg
Cemex - Near Peebles

Client:

Cemex

Location:

Near Peebles

Duration:

6 Weeks

Job Description:

Cowieslinn Quarry, Overburden Stripping &Tip Construction.

project-3.jpg
Cemex - Newbridge

Client:

Cemex

Location:

Newbridge

Duration:

6 Weeks

Job Description:

​Bonnington Mains Quarry, Overburden Stripping &Tip Construction.

project-3.jpg
Hunts Contractors - Livingston

Client:

Hunts Contractors

Location:

Livingston

Duration:

4 Weeks

Job Description:

Glenturner Distillery, Soil stripping and reduction to formation level & Tip construction.

project-3.jpg
Black & Veatch - Glencorse, Penicuik

Client:

Black & Veatch

Location:

Glencorse, Penicuik

Duration:

2.5 Years

Job Description:

Excavation and formation works to enable water treatment buildings to be constructed below original ground level. 

Muck hauled to on site tips as well as hauling to our off site SEPA licensed tip. Supply and laying of Geotextiles and

 gravel to provide horizontal and vertical drainage around the structures. Compaction of suitable clays around the 

structures as well as placing topsoil on the roof of the structures with low ground pressure machines.

project-3.jpg
Sir Alfred McAlpine - All over UK

Client:

Sir Alfred McAlpine

Location:

All over UK

Duration:

2 Years

Job Description:

Topsoil stripping, excavation of trench for laying of Gas Pipeline, backfilling and reinstatement of soils.

project-3.jpg
Norwest – Socea - All over UK

Client:

Norwest – Socea

Location:

All over UK

Duration:

6 Years

Job Description:

Topsoil stripping, excavation of trench for laying of Gas Pipeline, backfilling and reinstatement of soils.

project-3.jpg
Stewart Milne Homes – East Kilbride

Client:

Stewart Milne Homes

Location:

East Kilbride

Duration:

6 Months

Job Description:

Enabling works contract - preparation of ground (mostly peat) for house building and road network

project-3.jpg
Onyx, Amec, Crouch and Miller Mining companies - Sites across Scotland

Client:

Onyx, Amec, Crouch and Miller Mining companies

Location:

Sites across Scotland

Duration:

7 years / seasonal works

Job Description:

Stripping of soils in advance of coaling operations, land reclamation of former opencast, restoring former works
with soils from advance cuts or from previously erected storage dumps.

project-3.jpg
Edmund Nuttall Ltd - Ravenscraig, Motherwell

Client:

Edmund Nuttall Ltd

Location:

Ravenscraig, Motherwell

Duration:

3 Years

Job Description:

Formation of secure containment facility

Removal of contaminated land

Encapsulation of 4m tonnes of contaminated material

Slagbed restoration, concrete remediation

Overall landscaping of the site, for future use.

project-3.jpg
Scottish Resources Group - Sites across Scotland

Client:

Scottish Resources Group

Location:

Sites across Scotland

Duration:

Ongoing / seasonal works

Job Description:

Soil Stripping of new operational areas and land reclamation on former opencast coal sites

project-3.jpg
Mowlem Scotland Ltd - Livingston

Client:

Mowlem Scotland Ltd

Location:

Livingston

Duration:

8 Months

Job Description:

Earthworks for construction of Livingston Football Stadium, car park and road network

project-3.jpg
Mowlem Scotland Ltd - East Kilbride

Client:

Mowlem Scotland Ltd

Location:

East Kilbride

Duration:

6 Months

Job Description:

Enabling works contract - Earthworks to provide formation level to allow construction of the Kingsgate Retail Park

project-3.jpg
Mowlem Scotland Ltd - M8 Junction 4

Client:

Mowlem Scotland Ltd

Location:

M8 Junction 4

Duration:

6 Months

Job Description:

Earthworks to provide formation level to allow construction of the M8 J4 distribution park. Construction of SUDS ponds and environmental control measures