OUR PROJECTS
Click Photo for more information.
Kier - Greenburn Project
Client:
Kier
Location:
Greenburn
Duration:
ongoing
Job Description:
Continuation of restoration of the former opencast surface mine, by removing previously bunded overburden and soils and placing in accordance with approved restoration plan. Naturalizing redundant water settlement lagoons and other environmental improvements to return the site to wildlife and agricultural use.
Synergy - Millerhill Phase 2
Client:
Synergy
Location:
Millerhill Phase 2
Duration:
ongoing
Job Description:
Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to specification for future, SUDS ponds, house building and road construction. All done with GPS enabled equipment to mm accuracy.
Great British Prawns - Balfron
Client:
Great British Prawns
Location:
Balfron
Duration:
2 weeks
Job Description:
Factory development – Installation of new and upgrading of existing drainage, supply of imported quarried stone for drainage and landscaping. Cut and fill landscaping works and Resoil designated areas.
Tarmac- Hillwood
Client:
Tarmac
Location:
Hillwood
Duration:
3 months
Job Description:
Quarry Operations – Recycling by munching concrete off ex demolition material, remove steel into recycled skips. Crush ex demolition concrete to produce 6F5 to highways specification for future reuseon of suitable clays around the
structures as well as placing topsoil on the roof of the structures with low ground pressure machines.
Synergy - Millerhill
Client:
Synergy
Location:
Millerhill
Duration:
1 week
Job Description:
Housing development – Site Clearance. Removal of trees, hedgerows and mulching felled wood and site vegetation, prior to earthworks commencing.
Cemex - Bonnington
Client:
Cemex
Location:
Bonnington
Duration:
3 months
Job Description:
Quarry Operations - loading quarried material into crushing equipment to produce Highway specification Type 1 and Crusher run.
Tarmac - Snabe
Client:
Tarmac
Location:
Snabe
Duration:
2 months
Job Description:
Quarry Operations – loading quarried material into crushing /screening equipment to produce single sized stone products 10mm and 20mm to highways specification.
Bell Ingram - Calla Road
Client:
Bell Ingram
Location:
Calla Road
Duration:
2 weeks
Job Description:
Forestry Development – Stripping soils, carrying out cut to fill to form track profile and supply, spread and compact imported quarry stone, all to allow HGV’s access to site to haul away logs that have been previously felled.
Ruchlaw Produce - Rigside
Client:
Ruchlaw Produce
Location:
Rigside
Duration:
3 months
Job Description:
Agricultural Development – Creation of formation area to allow road network, buildings, and slurry store to be constructed. Strip soils and landscape on site. Carry out cut and fill and landscape surplus material on site. Profile the area with GPS equipment prior to supplying and spreading stone to allow builders to start construction.
Tarmac - Cairneyhill
Client:
Tarmac
Location:
Cairneyhill
Duration:
3 months
Job Description:
Quarry Development – Stripping soils, peat, and overburden to expose the product hard rock, cleaning rockhead in preparation for blasting. Soils and peat used to restore completed parts of the quarry. Desilting of fines from processing plant and incorporating into progressive restoration on site.
McGregor - East Law Farm
Client:
McGregor
Location:
East Law Farm
Duration:
1 month
Job Description:
Agricultural development – Creation of an approved slurry lagoon. Strip soils from footprint of area, excavate into slope and use excavation to fill lower section of site, profile lagoon accurately to specifications, install pipework for future slurry pumping and land drainage altered due to footprint of new lagoon. Resoil disturbed ground
Harry Hamilton - Nun Raw Farm
Client:
Harry Hamilton
Location:
Nun Raw Farm
Duration:
2 months
Job Description:
Agricultural developments - Demolition of existing farm buildings and earthworks in preparation for future farm development.
Advance - Newton Farm Phase 4
Client:
Advance
Location:
Newton Farm Phase 4
Duration:
5 months
Job Description:
Housing development – Moving previously surcharged material which had been used to compress the ground below for a specified period. Allowing preparation for building works to commence after a suitable monitoring period. Cut, fill and compaction in virgin ground in preparation of house building.
Tarmac - Douglas Muir
Client:
Tarmac
Location:
Douglas Muir
Duration:
3 months
Job Description:
Quarry Development – Stripping soils and overburden to expose the product hard rock in preparation for blasting. Soils from advance strip used to restore completed part of the quarry and the overburden used to enhance the quarry restoration profile whilst dealing with complex geotechnical features.
Advance- Newton Farm Phase 3
Client:
Advance
Location:
Duration:
2 months
Job Description:
Housing development – Moving previously surcharged material which had been used to compress the ground below for a specified period. Once the 100,000 tonnes of material removed, this allowed the preparation for building works to commence after a suitable monitoring period.
Tarmac- Newbigging
Client:
Tarmac
Location:
Newbigging
Duration:
2 months
Job Description:
Quarry Development – Strip soils and overburden to expose the product Sand and Gravel. All materials hauled into designated stockpile which was landscaped for use as visual and noise reduction screening bund.
Cemex - Newbridge
Client:
Cemex
Location:
Newbridge
Duration:
4 months
Job Description:
Quarry Development / Operations - Strip soils and overburden to expose the product rock. All materials hauled into designated areas for quarry restoration. Product rock already on site pushed to new area for processing on site.
Advance - Mavor Ave
Client:
Synergy
Location:
Mavor Ave
Duration:
2 months
Job Description:
Housing development – Rip up concrete floor from previous factory, recycle steel, hammer oversize concrete slabs prior to crushing. Crush demolition concrete and spread on site for access to piling rig. Carry out Cut to Fill operations and compact to specification for future, house building and road construction
Advance - Monifieth
Client:
Advance
Location:
Monifieth
Duration:
4 months
Job Description:
Housing development - Strip soils and create screening bunds around the site. Carry out Cut to Fill operations and compact to specification for future, SUDS ponds, house building and road construction. Excavate rock from onsite borrow pit and process via crushing and screening equipment to produce 6F2 and 10-20mm drainage products all for use on site to minimise imported quarried materials.
Advance - Halo Project Kilmarnock
Client:
Advance
Location:
Halo Project Kilmarnock
Duration:
5 months
Job Description:
Housing development – Rip up concrete slabs from former whisky factory, separate steel rebar from concrete, recycle steel and process concrete for re use on site. Earthworks involved cut / fill and compaction allowing future construction works to take place.
Menzies Contracts - Moorfield Kilmarnock
Client:
Menzies Contracts
Location:
Moorfield Kilmarnock
Duration:
4 Months
Job Description:
Industrial development – In preparation of industrial units being constructed, strip soils and place in onsite designated tips. Carry out cut, fill and compaction to formation levels set on site with surplus materials being landscaped on site. Spread and compaction of imported quarry stone.
Transport Scotland - A9 Aviemore
Client:
Transport Scotland
Location:
A9 Aviemore
Duration:
2 years
Job Description:
Road Upgrade and construction – All works carried out in line with strict environmental control measures associated with operating within a national park. MWP involved in relocating wildlife habitat, such as ants’ nests. MWP carried out all site clearance, demolition of existing structures on old A9, Earthworks including borrow pits to support site and hauling in materials from local quarries, all Drainage, Communication Ducting, Landscaping including placement of stone on verges and central reservations throughout the entire 8km dual carriageway, 10km of side roads and 8km of cycle / footpaths all to highway specification. MWP carried out all works on site up to underside of blacktop except for concrete structures.
Cemex - Near Peebles
Client:
Cemex
Location:
Near Peebles
Duration:
6 Weeks
Job Description:
Cowieslinn Quarry, Overburden Stripping &Tip Construction.
Cemex - Newbridge
Client:
Cemex
Location:
Newbridge
Duration:
6 Weeks
Job Description:
​Bonnington Mains Quarry, Overburden Stripping &Tip Construction.
Hunts Contractors - Livingston
Client:
Hunts Contractors
Location:
Livingston
Duration:
4 Weeks
Job Description:
Glenturner Distillery, Soil stripping and reduction to formation level & Tip construction.
Black & Veatch - Glencorse, Penicuik
Client:
Black & Veatch
Location:
Glencorse, Penicuik
Duration:
2.5 Years
Job Description:
Excavation and formation works to enable water treatment buildings to be constructed below original ground level.
Muck hauled to on site tips as well as hauling to our off site SEPA licensed tip. Supply and laying of Geotextiles and
gravel to provide horizontal and vertical drainage around the structures. Compaction of suitable clays around the
structures as well as placing topsoil on the roof of the structures with low ground pressure machines.
Sir Alfred McAlpine - All over UK
Client:
Sir Alfred McAlpine
Location:
All over UK
Duration:
2 Years
Job Description:
Topsoil stripping, excavation of trench for laying of Gas Pipeline, backfilling and reinstatement of soils.
Norwest – Socea - All over UK
Client:
Norwest – Socea
Location:
All over UK
Duration:
6 Years
Job Description:
Topsoil stripping, excavation of trench for laying of Gas Pipeline, backfilling and reinstatement of soils.
Stewart Milne Homes – East Kilbride
Client:
Stewart Milne Homes
Location:
East Kilbride
Duration:
6 Months
Job Description:
Enabling works contract - preparation of ground (mostly peat) for house building and road network
Onyx, Amec, Crouch and Miller Mining companies - Sites across Scotland
Client:
Onyx, Amec, Crouch and Miller Mining companies
Location:
Sites across Scotland
Duration:
7 years / seasonal works
Job Description:
Stripping of soils in advance of coaling operations, land reclamation of former opencast, restoring former works
with soils from advance cuts or from previously erected storage dumps.
Edmund Nuttall Ltd - Ravenscraig, Motherwell
Client:
Edmund Nuttall Ltd
Location:
Ravenscraig, Motherwell
Duration:
3 Years
Job Description:
Formation of secure containment facility
Removal of contaminated land
Encapsulation of 4m tonnes of contaminated material
Slagbed restoration, concrete remediation
Overall landscaping of the site, for future use.
Scottish Resources Group - Sites across Scotland
Client:
Scottish Resources Group
Location:
Sites across Scotland
Duration:
Ongoing / seasonal works
Job Description:
Soil Stripping of new operational areas and land reclamation on former opencast coal sites
Mowlem Scotland Ltd - Livingston
Client:
Mowlem Scotland Ltd
Location:
Livingston
Duration:
8 Months
Job Description:
Earthworks for construction of Livingston Football Stadium, car park and road network
Mowlem Scotland Ltd - East Kilbride
Client:
Mowlem Scotland Ltd
Location:
East Kilbride
Duration:
6 Months
Job Description:
Enabling works contract - Earthworks to provide formation level to allow construction of the Kingsgate Retail Park
Mowlem Scotland Ltd - M8 Junction 4
Client:
Mowlem Scotland Ltd
Location:
M8 Junction 4
Duration:
6 Months
Job Description:
Earthworks to provide formation level to allow construction of the M8 J4 distribution park. Construction of SUDS ponds and environmental control measures